Name Building Employee Request Date Status
pipe leakage Moweleh commercial RE- 696/60 24/04/2025 New
bathroom door and false ceiling issue Shk.Saud Bldg-Muweileh 24/04/2025 New
wall repair and touch up Shk.Saud Bldg-Muweileh 24/04/2025 New
light and pipe issue Industrial 17 24/04/2025 New
wall repair Al Saud Head Office C 24/04/2025 New
glass partition from bathroom to be removed Shk.Saud Bldg-Muweileh 24/04/2025 New
light issue Qulaya a 1 24/04/2025 New
drain cover broken Shaikha Naama Tower B 24/04/2025 New
fly mesh issue Shaikha Naama Tower A 24/04/2025 New
vacant flat washroom door repairing Shaikh Majid Building 24/04/2025 In Progress
towel hanger to be fixed, hanging light issue Shk.Saud Bldg-Muweileh 24/04/2025 New
vacant flat painting Qusais 4th (2) 247-108 24/04/2025 In Progress
water heater to be installed Shk.Khalid Farm House at Zubair 24/04/2025 New
Kitchen wall tiles pop up and floor tile grouting Shk.Saud Bldg-Muweileh 24/04/2025 In Progress
shower leakage Shaikha Naama Tower A 24/04/2025 New
shower mixer issue Nabba a TA 23/04/2025 New
main door lock issue Moweleh Commercial 696/53 Block A 23/04/2025 New
main door repair Qusais Building 23/04/2025 New
roof booster pump issue Shk.Khalid Villa-Ramla 23/04/2025 New
grouting work Jumeirah Villa fr Shk.Abdul Aziz 23/04/2025 New
shattaf issue Khalid 23/04/2025 New
Floor tile issue Shaikh Abdul Aziz Butaina 23/04/2025 New
main door lock issue Moweleh Commercial 696/53 Block A 23/04/2025 New
Sing board removing Shaikha Naama Tower Parking 23/04/2025 In Progress
balcony pipeline issue Shaikha Naama Tower B 23/04/2025 New
cleaning work Al Mahata 23/04/2025 In Progress
mason work J-155 Zubair Villa 23/04/2025 New
Calling bell issue Nabba a TA 23/04/2025 New
scaffolding shifting Industrial 17 23/04/2025 In Progress
generator room electrical work Moweleh Commercial 696/53 Block B 23/04/2025 New
kitchen cabinet hinges Shaikha Naama Tower B 23/04/2025 New
shower handle, flush and wash basin drain issue Shaikha Naama Tower A 23/04/2025 New
transfer pump leakage -parking Al Saud Head Office B 23/04/2025 New
time switch issue Al Saud Head Office B 23/04/2025 New
inside wall lights fixing Mansoora Villa 1-Sh.Majd 23/04/2025 New
seat cover, shower set and Shattaf issue Shaikha Naama Tower B 23/04/2025 New
wc change request Qulaya a 1 23/04/2025 New
plumbing issue Al Hazana Villas Shaikha Lobna 23/04/2025 New
sink pipe broken Shaikha Naama Tower A 23/04/2025 New
Cleaning work Qusais 4th (2) 247-108 23/04/2025 In Progress
bulbs issue Shaikha Naama Tower A 23/04/2025 New
Lights issue Shaikh Majid Building 23/04/2025 New
balcony door Issue Industrial 17 23/04/2025 In Progress
11th Floor Gas room door and lock repairing Shaikha Naama Tower B 23/04/2025 In Progress
Grouting work Al Saud Head Office A 23/04/2025 In Progress
1st Floor garbage S/S door repairing Shaikha Naama Tower A 23/04/2025 In Progress
Time Switch issue Al Saud Head Office C 23/04/2025 New
villa entrance painting Shk.Sultan Villa - Jumeirah 23/04/2025 In Progress
vacant flat painting and other works Shaikh Majid Building 23/04/2025 In Progress
Cleaning work Hamriyah Building 23/04/2025 In Progress
new bathtub fixing Moweleh commercial RE- 696/60 23/04/2025 New
swimming pool marble fixing and grouting work Shk.Sultan Villa - Jumeirah 23/04/2025 New
wall tiles coming out Al Mahata 23/04/2025 In Progress
Floor tile issue Shaikh Abdul Aziz Butaina 23/04/2025 In Progress
mirror clip issue Shaikha Naama Tower A 23/04/2025 In Progress
Move Out Process for Tenant Mohamed Obaid Yousef Alkhadar Al-Ali, Flat Moweleh Commercial 696/53 Block B - Flat/MCB-501, from 2024-05-01 to 2025-04-30, Termination Date 2025-05-01 Moweleh Commercial 696/53 Block B 23/04/2025 In Progress
Sink issue Ajman Villa 2 - Shk.Abdul Aziz 23/04/2025 In Progress
generator room door lock repairing Al Taawun Bldg 23/04/2025 New
glass door repairing Shk.Saud Villa-Nouf 23/04/2025 In Progress
wc and wash basin new fixing Khalid 23/04/2025 New
Socket and breaker issue Al Saud Head Office B 23/04/2025 New
4th floor garbage room switch issue Shk.Saud Bldg-Muweileh 23/04/2025 New
telephone room Light issue Shaikha Naama Tower B 23/04/2025 New
main DP checking Shaikh Majid Building 23/04/2025 New
wash basin blocked - 2 bathrooms Moweleh Commercial 696/53 Block A 23/04/2025 New
WC flush repair Shka Majd Building Al Nabba 23/04/2025 New
Security room light Shaikha Naama Tower B 23/04/2025 New
kitchen pipe and bedroom light Butaina-Shaikh Sultan plot 186 23/04/2025 New
bulb issue Al Saud Head Office C 23/04/2025 New
Extra electrical point removing Shaikha Naama Tower A 23/04/2025 New
shattaf issue Qulaya a 1 23/04/2025 New
water heater switch checking Butaina-Shaikh Sultan plot 186 23/04/2025 New
hot water issue Al Saud Villas ASV-12 23/04/2025 New
Move in Process: Contract For Mohd Zekerya - ['Shop/SNA 1-19 '] - 2025-04-25 -To- 2032-06-07 Shaikha Naama Tower A 23/04/2025 New
kitchen cabinet hinges issue Shaikh Abdul Aziz Butaina 23/04/2025 New
hand shower issue Moweleh Commercial 696/53 Block A 23/04/2025 New
light repairing work G+1 Beach House 23/04/2025 New
New pump fixing Shk.Khalid Villa-Ramla 23/04/2025 New
cupboard repair Shaikha Naama Tower A 23/04/2025 In Progress
washroom light and towel hanger issue Shaikh Abdul Aziz Butaina 23/04/2025 New